Friday, 28 January 2011

26th January '11

Very exciting day as we took all our possessions (apart from stuff needed on van) up to Manchester and stored it all in the boat shed awaiting completion of the boat!!!

Lots seem to have been done in the 10 days or so since we last saw it and Jim still assures me that we will be on it in time to sail to the wedding. I do hope so...

Apparently I don't have enough whatever I need on my dongle to download pictures at present, which is frustrating! Hopefully I can add them soon but in the meantime....

The painting has started - undercoat is looking good and the windows are in situ - the brass on the dark green looks really smart as we knew it would!

Inside the woodwork has started to be varnished so it looks a lot less 'raw' and more like a narrowboat! My office space is completed and looks great - they have done a really lovely job and all I have to do is to find a comfy chair!

All the doors are made and being varnished before going in and the oak trim was arriving the next day so that could start to be fitted.

Johns pride and joy - the engine - was next to the boat, in it's box - all green and shiny - and was going to be fitted the next day and the gas system is about to be installed!

Although there is still a lot to do - everything seems to be there and just waiting to be done - Jim says that it all comes together very suddenly at the end. Please let him be right!

We have said almost all our goodbyes now and are going to move 'up north' on Sunday 6th. so that we can be nearer the boat for final tweaks - such as the sign-writer. We shall probably have another visit very shortly after moving up and I HOPE that I have a strong enough connection to add the pictures either then or earlier if possible.

Sunday, 16 January 2011

15th Jan '11

We went up to Manchester to see the boat on Saturday and it's a bit of a good news / bad news situation. Bad news is that because of the weather and a bereavement it looks as if the finish date will be mid Feb. so I'm holding out for Valentines Day! the weather meant that the painting couldn't go ahead as it wouldn't have taken and the material we chose for the upholstery is out of stock! there has also been a delay on the multi-fuel stove! having said all of that the good news is that the end is in sight; we have met with the painters and confirmed where all the finishing touches are to be and how the name is to be positioned and they start next week; we have chosen a new material and this one is guaranteed obtainable; lots of 'behind the scenes' stuff has been done (such as cupboard doors made) and we have changed the layout of my 'office' so I will have twice as much room! We have also been told that we can start to take stuff up there and they will store it and then put it on the boat before launch so we can get straight on board and start unpacking! Brilliant.

Since John finished work next Friday we will be able to go up mid-week and load the van to the gunnels and that will mean the whole transition will be a lot easier.

I will put some photos on but to be honest it may not look very different - but rest assured that things ARE moving ahead!



This is above the bed cupboards - they are cut around the porthole and you can also just see John's bedside cupboard! - there are now shelves in my wardrobe behind and also in the next one for the washer and dryer plus some storage above them!




 The cupboard is now in above the worktops. This will be glazed both sides and lit for us to keep our glasses in - hopefully they are packed and safe in Rachel and Matt's loft! Can't remember what we kept and what we got rid of but I'm SURE we kept some crystal to go in here! You can also see that the brass roof lights are now in (ignore the naked light bulbs - they are not part of our fixtures and fittings!



 The boat is NOT on a tilt but John appears to have been when he took this! This is Jim coming in through the bow entrance and you can see the cupboards progressing around the radiator. Jim hates having his photo taken so this is a triumph!


This is the same view but a bit closer - the radiator will be covered with a grille that is made and waiting to be fixed but they are going to paint the radiator matt black first so that it won't be obvious behind the grille. These cupboards need to store our entire collection of books, DVD's and CD's so thank heavens for our Kindles!




This is the hatch which in the summer when I'm preparing a light steak and salad to eat with a glass of wine outside in cratch (the bit up the front) I can open this and exchange cheery words to passers by or watch the other boats go by (depending on which side we are moored). It also means that we can keep the place cool in the hot weather that we are sure to get!!



This needs some thinking about but it's where the steering will go on - the engine is under here and the tiller will be at the back - there will be room for me and Paddy to sit and watch the world go by when John is steering or for me to steer when he is working the locks! Division of labour is important in these matters.....

Hopefully we will be going up again in about 10 days time and painting should have started, the engine should be in and other bits will be coming together by then and we may even have a FIRM date!!!!!

Sunday, 12 December 2010

10th December '10

We were a weekend later than expected going up for this visit, because of severe snow conditions last week! Unheard of for November but guess it's just our luck!
Anyway the wait was well worth while as the boat is coming on well now and we can expect late January for completion (as long as weather doesn't halt any of the suppliers or sub-contractors).
I will put loads of photos on this time so starting from the front - there's nothing been done to the bow as yet but here is anyway...
Then looking into the boat from the bow we have the saloon with the kitchen behind and a peep into the bathroom (there will be a door when it's finished - we are not THAT open plan!)

you can see the radiators in place and the shelving in the foreground - at the front on that side will be the TV and on the other side a solid fuel stove - you may be able to see that there is already a wine rack in place!


close up of the wine rack!!

The kitchen is coming on a treat - the oven and microwave are already there as is our wonderful larder units - on either side of the end of the kitchen, two pull out units with metal shelves to take LOTS of groceries to keep us going when we are on the move.


these photos show them clearly and you can see our shower in the background! As the bathroom is pretty much shown here - and I don't think you need to see the main toilet hiding behind the wall I shall move on down the boat!


 beyond the bedroom - which is still pretty much as it was but now has bedside cabinets - there is the second toilet - obviously there are some walls to go in here but this will have a handbasin and will be useful for a quick comfort stop for the captain! the thing in cellophane is a calorifier which will convert the power from the engine to heat the boat and is pretty important.
opposite this is my office cubbyhole and the washer and tumbler drier so quite an important section of the boat - if not as pretty as the front end!


this -believe it or not - is my office! I will have a shelf for the computer and one for the printer and then a small seat for me! Not much but it means that I can keep the blog going - check Facebook and Skype people without having to put the computer away all the time and also be close to John when he's steering the boat! Ahhhh.

Now because John likes them are some external shots of the boat - don't despair - it won't look like this next time - Jim and Paul reckon they are getting the  painters in to start on the external work next week so the next time we shall see it there should be quite a change. We have confirmed it to be dark green with red and cream trims and a cream roof. Quite traditional colours which we have always liked.



nothing like seeing a photo of yourself to want to make you lose weight!!

The other exciting part of the visit was going to chose the upholstery pattern for the dining suite and the cushion floor for the baltroom / kitchen area - the rest of the floor will be oak. We have gone for a suprisingly different (for us) fabric - a sort of rich cream brocade with green and terracotta flowers - looks MUCH better than it sounds and a multi-colour diagonal stone tile effect floor. Hopefully it will match the shower panel that is already chosen and in situ as well as the granite effect worksurface that again has already been chosen.

That's pretty much it for this visit - we are going up again after the new year to make the final choices. There is some discussion about putting us in the water further south which would avoid some of the bad weather if it comes in freezing again as some of the canals are frozen after last week. This would be great as far as I'm concerned as it would be less travelling to get us to Cambridge for March but we shall see.... continue to watch this space......

Wednesday, 17 November 2010

more photos

John has told me that I ought to have added more photos and so here they are, basically some more of the lifting and then some of the inside before the wooden walls were added showing the insulation. It's a bit harder to see which rooms are which but it gives the general idea.



Sunday, 7 November 2010

5 Nov 10

We have been up to Manchester and seen the boat, plus got some photos of it arriving on site (see below).
I think I have worked out how to get the pictures in the right place - hopefully this entry will be a bit more together - we live and learn!
She now has her ballast in place and floors fitted plus some of the bulkheads in place (the bits that divide the rooms). the kitchen cupboards are in situ and we have been making decisions on things like the cooker and whether to have a microwave (we will but only a small one since we have the space).

Talking of space - it seems HUGE and the cupboard space seems enormous considering what I have been managing with for the last 6 months. John and I are amazed at how room it seems although we realise that there is still a lot of stuff to go in.
the shower tray is in place and so is the main frame of the bed.

we are delighted that they have managed to juggle the space at the back so that I can have a little office space, there is a separate (2nd) toilet and still room for a wet locker and a wardrobe each. It really is going to be something special when it's complete. Paddy came aboard and inspected it all including the dining arrangements - they appeared to meet with his approval!
talking of completion - it looks as if our estimate for sometime in January is pretty much accurate although we have been promised a more definate date when we next go up at the end of the month. Then we get to decide furnishings and floor coverings, so it will be much more together then.
we are now more excited than ever as it really is far more of a reality and getting more so each day.
not all the windows are cut through and the boat is currently in undercoat mode but if anyone wants to know anything more about any of it, get in touch and we will try to answer any questions.
I will add more in a few weeks when we have seen the next stage......

Tuesday, 26 October 2010

October 25th

Still no photos from Jim and Paul but assume that the build is continuing - John gets phone calls asking what ceiling we want and suchlike so presumably something is being done. We are going up on 6th Nov. to see progress and then I will be able to take some photos myself and post them - at least we should be able to see a difference from the original one!
In the meantime I have been away and done my Helmsman Certificate and so can now moor more confidently and have mastered the knots so feel quite happy with myself. Theoretically I know how to work the lock paddles as well and although I oversaw the process and was able to direct the others (always one of my skills) I didn't actually do it myself following orders from the osteopath never to touch them......
I have to say that the scariest part of it was taking the boat into the lock, which is usually my job so I am used to doing it, but I have always gone in slowly and carefully - we were taught to go hell for leather and if you have no experience of canals and locks etc. believe me that steering a large metal boat towards an even larger lock wall at top revs is really nerve-wracking! however I did it, didn't hit anything and can see the logic of it all now. Our boating is going to be quite different from what I had envisaged I suspect!

Wednesday, 8 September 2010

8th September

I was going to put something on earlier but found that starting a blog was one thing - finding out how to get back onto it was another (thanks Francesca - what would I do without you?) THEN I forgot my password and locked myself out. Anyway - I found my way back and here we are.
We met Jim at the boat show and discovered that the boat is still not up with him as he was finishing off the last one - by all accounts it should be there by now but I'm not holding my breath.
We did important things like ordering the settee, and buying Paddy a lifejacket. If I can work out how to do it I'll add a picture of him in it!
We are still hoping for a completion date of end of November and we reckon we will be in the marina as planned for Christmas - I told Jim that if the boat wasn't ready then we would go up there and have Christmas in his shed. He didn't seem as fazed by that as I might have hoped.
The boat he was showing up there was lovely - if anyone wants to see the boats he produces there is a gallery of them on Sabre Narrowboat web site - worth a look if you have time.
So all in all not a lot of progress but a great time was had at the show and we feel that step nearer - now it's September and the weather is becoming autumnal we are getting quite keyed up for getting on board but life in the van is still good and we are not missing a house at all suprisingly. After living for months in a 22'6" van the 62' boat will be HUGE!!!!